IMG_0009-scaled.jpg?w=1024&h=768&scale
Blackley E-ACT Academy, Manchester
IMG_0009-scaled.jpg?w=1024&h=768&scale
IMG_0008-scaled.jpg?w=1024&h=768&scale
IMG_0007-scaled.jpg?w=1024&h=768&scale
IMG_0006-scaled.jpg?w=1024&h=768&scale
IMG_0004-scaled.jpg?w=1024&h=768&scale
IMG_0003-scaled.jpg?w=1024&h=768&scale
IMG_0002-scaled.jpg?w=1024&h=768&scale
IMG_0001-scaled.jpg?w=1024&h=768&scale
Blackley-PHOTOS-Ele-E6-02.jpeg?w=1024&h=768&scale
Blackley-PHOTOS-Quad-QWG.05a-09a-02.jpeg?w=1024&h=768&scale
Blackley-PHOTOS-WG.06-07-08-01.jpeg?w=1024&h=786&scale
Blackley-PHOTOS-WG.01-02.jpeg?w=1024&h=768&scale
Blackley-PHOTOS-Quad-QWG.05b-01.jpeg?w=1024&h=768&scale
Blackley-PHOTOS-Quad-QWG.09b-01.jpeg?w=1024&h=768&scale

    Project Overview

    3D Aluminium was appointed by E-ACT Academies Head Office as the Principal Contractor to undertake a comprehensive window and door replacement programme at Blackley E-ACT Academy in Manchester.

    The project involved the replacement of a wide variety of glazing elements across the academy, including standard windows, high-level windows, circular pivot windows, and large arched feature windows. The objective was to improve thermal performance, security, and functionality while maintaining the character and appearance of the existing buildings. The designs incorporated modern Georgian bar detailing to complement the academy’s existing architecture and maintain consistency with neighbouring properties. Solar control glazing was specified throughout the project to improve internal comfort, reduce solar gain, and enhance the overall thermal performance of the building.

    The preservation of the site’s character and appearance was essential in maintaining and reflecting the historical significance of the building. This is illustrated through its timeline:

    • 1931: Purpose-built as an elementary/primary school
    • 1931–2011: Operated as a local authority school, later known as Victoria Avenue Community Primary School
    • 2012–present: Restructured, rebranded, and incorporated into the E-ACT Academies Trust, reopening as E-ACT Blackley Academy on 1 January 2012

     

    Due to the varied elevations and window configurations, works were undertaken using a combination of:

    • Scissor lifts
    • Cherry pickers
    • Mobile access towers
    • Fixed scaffolding within the courtyard areas

    Careful planning and coordination ensured all works were completed safely and efficiently while maintaining the day-to-day operation of the academy.

    The project was delivered within a fully operational school environment, requiring close collaboration with academy staff throughout the programme.

    Several phases of the works coincided with SATs examinations. To minimise disruption, 3D Aluminium worked closely with the school leadership team to carefully schedule activities, ensuring examination periods were protected. This approach was highly successful and received positive feedback from the school.

     

    Particular attention was also given to the courtyard area, which serves as an important outdoor space for SEN pupils. This section of the project was prioritised to ensure the playground could be returned to full operation as quickly as possible.

     

    One of the primary challenges involved telephone cables running along the front elevation of the building. Due to programme constraints and the cost implications associated with relocating the cables, an alternative solution was required. Through detailed planning and careful execution, 3D Aluminium successfully completed the window replacement works around the existing services without disruption or damage, ensuring the project programme remained on track.

     

    The erection and dismantling of scaffolding also took place during term time. Effective communication and planning with the school enabled materials to be moved into working areas either before the school day commenced or during lesson times, avoiding disruption to students and staff.

     

    Through proactive communication, careful planning, and a collaborative approach with academy leadership, 3D Aluminium successfully delivered a complex refurbishment project within a live educational environment, achieving excellent results for both E-ACT Academies and Blackley E-ACT Academy.

    Project Details

    System:

    Technal

    Products:

    TECHNAL Stormframe II Thermally Broken Door System

    TECHNAL Dualframe 75Si Thermally Broken Window System

    Principal Contractor:

    3D Aluminium

    Client:

    E-Act Academy Trust

    Value:

    £390,822.00

    Location:

    Manchester

    • Established in 1973, we have over 53 years experience
    • Leading players in the commercial and public sectors
    • Approved & accredited fabricators/installers
    • Supported by an industry leading network of suppliers

    Secured by Design

    The official UK flagship initiative combining the principles of ‘designing out crime’ with physical security.

    Download PDF

    ISO 9001

    ISO 9001 is a certified quality management system (QMS) for organisations who want to prove their ability to consistently provide products and services that meet the needs of their customers and other relevant stakeholders.

    Download PDF

    ISO14001

    ISO14001 is a certified environmental management system (QMS) for organisations who want to prove their ability to consistently provide products and services that meet the needs of their customers and other relevant stakeholders.

    Download PDF

    ISO45001

    ISO 45001 is an international standard that specifies requirements for an occupational health and safety (OH&S) management system. It provides a framework for organizations to manage risks and improve OH&S performance.

    Download PDF

    BSI Kitemark

    The BSI Kitemark™ is a quality mark owned and operated by BSI. It is one of the most recognised symbols of quality and safety and offers true value to consumers, businesses and procurement practices

    Download PDF

    CHAS

    The Contractors Health and Saftey Assessment Scheme

    Download PDF

    ConstructionLine

    Constructionline is the UK's leading procurement and supply chain management service that collects, assesses and monitors standard company information through a question set that is aligned to PAS 91, the standardised pre-qualification questionnaire developed by BSI to reduce duplication within the construction industry.

    Download PDF

    LHC

    Trusted procurement for better buildings and homes.

    Download PDF

    Council for Aluminium in Building

    The Council for Aluminium in Building (CAB) was formed in 1994 by the bringing together three existing trade associations; the Architectural Aluminium Association, the Patent Glazing Contractors Association and the Aluminium Window Association. Its members include consultants, fabricators, installers, systems companies and many specialist product supply and manufacturing companies

    Download PDF

    UKCA

    UK Conformity Assessed. Products meeting UK safety, health, and environmental protection requirements.

    Oakfield Industrial Estate, Eynsham, Witney, Oxfordshire OX29 4TX