    Project Overview

    3D Aluminium was appointed by Wokingham Borough Council to deliver a comprehensive replacement of the windows, doors and associated external building elements at Bluebell House Care Home. In addition to the replacement of the existing glazing systems, the project included the removal and replacement of timber boards and replacement with Cedral Click Profiles, together with new soffits, fascias, gutters and downpipes across the ground floor, first floor and selected second-floor areas.

    The project was successfully completed while the care home remained fully operational, requiring careful planning, close communication with staff and residents, and a flexible approach throughout the programme.


    The refurbishment incorporated a range of Smarts Aluminium systems, including:

    • Alitherm 400 window and door systems
    • VS600 sliding windows
    • SmartWall doors

    A variety of window styles were installed to meet both resident safety requirements and the practical needs of care home staff and visitors, including tilt and turn windows, open-out windows and sliding windows. The project also included the installation of new bedroom doors, external entrance doors and emergency escape access doors.

    All doors were fitted with integrated anti-finger trap protection and hold-open closures, helping to improve accessibility while enhancing resident safety throughout the building.


    Approximately 75% of the building required scaffolding before installation works could commence. The scaffold was dismantled in carefully planned phases, allowing access to lower elevations while maintaining progress across the programme.

    Working within a live, occupied care home presented a number of unique logistical and operational challenges.

    To minimise disruption, a detailed installation schedule was developed to ensure occupied bedrooms were completed within a single working day wherever possible. Works to communal areas were phased separately, allowing residents and staff to continue using key facilities safely throughout the refurbishment.

    Daily coordination meetings were held with the Head Nurse to confirm planned access and discuss any changes required due to residents wellbeing or care requirements. This flexible approach enabled the programme to adapt to changing circumstances while maintaining high standards of care and site safety.


    As the care home remained operational throughout the project, secure on-site storage and dedicated welfare facilities were established for the installation teams.

    Pre-start surveys identified low-hanging overhead cables that could have affected site compounds and welfare unit positioning. These were carefully assessed before equipment arrived, ensuring safe installation and avoiding unnecessary delays.

    With only a small compound available within the care home’s car park, material storage space was limited. Deliveries were therefore scheduled on a phased, just-in-time basis, aligning with the installation programme and ensuring materials were available when required without impacting the day-to-day operation of the site.


    Waste management formed an important part of the project. A large on-site skip was exchanged on a fortnightly basis by a certified waste carrier, allowing waste materials to be segregated and recycled wherever possible, helping to minimise landfill disposal throughout the refurbishment.


    Despite the complexities of working within a fully occupied care home, the refurbishment was completed successfully through careful planning, close collaboration with the client and care home management, and a flexible delivery programme.

    The completed project has provided Bluebell House with modern, high-performance aluminium windows and doors that improve safety, accessibility and energy performance while enhancing the appearance of the building.

    Throughout the works, the professionalism and considerate approach demonstrated by the 3D Aluminium team received praise from both care home staff and residents, who expressed their appreciation for how respectfully the works were carried out despite the challenging live environment.

    Project Details

    System Supplier:

    Smarts

    Products:

    Alitherm 400 Window Systems

    Alitherm 400 Door Systems

    VS600 Sliding Windows

    SmartWall Doors

    Principal Contractor:

    3D Aluminium

    Client:

    Wokingham Borough Council

    Project Value:

    £328,430.00

    Location:

    Wokingham

    • Established in 1973, we have over 53 years experience
    • Leading players in the commercial and public sectors
    • Approved & accredited fabricators/installers
    • Supported by an industry leading network of suppliers

    Secured by Design

    The official UK flagship initiative combining the principles of ‘designing out crime’ with physical security.

    Download PDF

    ISO 9001

    ISO 9001 is a certified quality management system (QMS) for organisations who want to prove their ability to consistently provide products and services that meet the needs of their customers and other relevant stakeholders.

    Download PDF

    ISO14001

    ISO14001 is a certified environmental management system (QMS) for organisations who want to prove their ability to consistently provide products and services that meet the needs of their customers and other relevant stakeholders.

    Download PDF

    ISO45001

    ISO 45001 is an international standard that specifies requirements for an occupational health and safety (OH&S) management system. It provides a framework for organizations to manage risks and improve OH&S performance.

    Download PDF

    BSI Kitemark

    The BSI Kitemark™ is a quality mark owned and operated by BSI. It is one of the most recognised symbols of quality and safety and offers true value to consumers, businesses and procurement practices

    Download PDF

    CHAS

    The Contractors Health and Saftey Assessment Scheme

    Download PDF

    ConstructionLine

    Constructionline is the UK's leading procurement and supply chain management service that collects, assesses and monitors standard company information through a question set that is aligned to PAS 91, the standardised pre-qualification questionnaire developed by BSI to reduce duplication within the construction industry.

    Download PDF

    LHC

    Trusted procurement for better buildings and homes.

    Download PDF

    Council for Aluminium in Building

    The Council for Aluminium in Building (CAB) was formed in 1994 by the bringing together three existing trade associations; the Architectural Aluminium Association, the Patent Glazing Contractors Association and the Aluminium Window Association. Its members include consultants, fabricators, installers, systems companies and many specialist product supply and manufacturing companies

    Download PDF

    UKCA

    UK Conformity Assessed. Products meeting UK safety, health, and environmental protection requirements.

    Oakfield Industrial Estate, Eynsham, Witney, Oxfordshire OX29 4TX